Sematan
February 1, 2006
Trip to Sematan during CNY eve!
At the Batang Kayan’s bridge, Lundu. At this point its already 11 pm. It took us 5 hours to reach Sematan because of a lot of motocycle problems such as battery, leaking radiator and cooling system problem.
Luckily my one and only green Ninja, able to reach the finish line without any problem and was able to carry 2 couples on the way (while I have to ride the other ZXR which had battery problem).
Boy, the boy who afraid of deep water, Me (in the middle) at Kpg Pueh’s waterfall. Water is cold and crystal clear.
We returned to Kuching by 2.30pm and arrived by 4pm at Batu Kawa junction. Raced along the way at 120~140km/h, able to sprint my green Ninja upto 180km/h at the winding roads near Bau.
It was a hard trip but a smile in the face when remembering the sweet moments with the new friends.
When I get back at 5 pm, I have to get ready for another function : Nazir’s engagement after Isya’ at the same day.



Leave a Reply